Forum Drilling Update, Aberdeen Uranium Project, Nunavut

1 October 2024

Vancouver, B.C., October 1, 2024 – Forum Energy Metals Corp. (TSX.V: FMC; OTCQB: FDCFF) (“Forum” or the “Company”) is pleased to announce its 2024 drilling program at the 100% owned Aberdeen Uranium Project has concluded after thirty diamond drill holes were completed between late June and late September for a total of 6,962 metres. The program covered 5 of the more than 20 identified gravity targets on the 95,000-hectare property including the two existing discoveries at Tatiggaq and Qavvik. The Aberdeen Project is located adjacent to Orano’s Kiggavik deposit which hosts 133 million pounds of uranium grading at 0.54% U3O8*.  Assays are currently being processed at the SRC Geoanalytical Laboratories in Saskatoon, Saskatchewan with results expected mid to late October due to a backlog at the facility.  Further to its news release dated August 20, 2024, Forum continues to intersect uranium mineralization and intense alteration within favourable structural and lithological corridors for unconformity-style uranium deposits in an emerging uranium district comparable to the prolific Athabasca Basin.

“Our 2024 program was highly successful.  We constructed a 40-person exploration camp to stage our future exploration efforts in the Thelon Basin with the expertise of our exceptional logistics team and were able to begin drilling in late June with a focus on our Tatiggaq deposit.” stated Rebecca Hunter, Vice President of Exploration,” In concert with that achievement was our ability to drill four additional targets including our second discovery, Qavvik.  The 2024 drilling will provide us with great knowledge to develop an even more exciting 2025 program that will include Tatiggaq and Qavvik expansion and further drilling of greenfield gravity low targets, including Loki and Ayra.  The 2024 and proposed 2025 drilling at Tatiggaq and Qavvik will provide us significant data to begin the development of a preliminary resource estimate.”