STLLR Gold Intersects 1.97 g/t Au over 41.5 m at the Colomac Main Deposit

13 June 2024

TORONTO, ONTARIO, June 13, 2024 – STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) (“STLLR” or the “Company”) announces assay results from the exploration drilling at the Colomac Gold Project in the Northwest Territories and at the Tower Gold Project in the Timmins Mining Camp in Ontario.

Table 1: 2024 Exploration Drilling Highlights – Colomac Main Deposit, Windjammer Central, and Windjammer South (See Figures 1-8):

Zone

Hole ID

Assay Result

Colomac Main

C24-01

1.97 g/t Au over 41.50 m (incl. 2.96 g/t Au over 21.25 m, also incl. 7.40 g/t Au over 2.55 m)

Note: “g/t Au”: grams per tonne gold; “m”: metres

Keyvan Salehi, P.Eng., MBA, President, CEO, and Director of STLLR stated: “Our exploration drilling continues to yield promising results. We intersected high-grade, coarse-gold mineralization at the Colomac Main Deposit in an area outside the estimated 2023 Colomac PEA1 pit-shell that had limited drilling data. At Windjammer Central, we intersected wide zones of mineralization in areas outside the known mineralization.”

“We anticipate receiving more exploration drill assay results from the Colomac Gold Project … in the coming weeks. Stay tuned for further updates.”