Camp Construction Begins; 10,000 Metre Drill Program To Commence Soon At The Aberdeen Uranium Project, Thelon Basin, Nunavut
21 May 2024
Vancouver, BC, May 21, 2024 - Forum Energy Metals Corp. (TSX.V: FMC, OTCQB: FDCFF) (“Forum” or the “Company”) announces it has commenced construction of its drill camp on the Aberdeen Uranium Project, located adjacent to Orano’s 133 million pound Kiggavik uranium deposit in the Thelon Basin, Nunavut. Forum’s contactor, Inuit-owned Peter’s Expediting Ltd. completed 11 trips of drills, camp and other equipment by sled train to the site located 120 kilometres west of Baker Lake, Nunavut. The snow has cleared and Discovery Mining Services of Yellowknife, NWT has commenced construction of a 30-person drill camp to support a 10,000 metre drill program by mid-June. Follow-up drilling will focus on building a resource identified by four holes drilled over a 200-metre strike length into the Tatiggaq deposit in 2023 which intersected up to 2.25% U3O8 over 11.1 metres. The structure hosting uranium mineralization at Tatiggaq extends for 1.5 kilometres within a highly altered uranium mineralized system.
Dr. Rebecca Hunter, Vice President, Exploration commented, “Forum’s geological team is evaluating the recent Ambient Noise Tomography (ANT) results to establish initial targets for the June drill program.”