LIFT Intersects 13 m at 1.11% Li2O at its Ki pegmatite, Yellowknife Lithium Project, NWT
6 February 2024
February 6, 2024 – Vancouver, B.C., Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 10 drill holes completed at the BIG West, Nite & Ki pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights:
Highlights:
- YLP-0184: 13 m at 1.11% Li2O, (Ki)
- YLP-0171: 12 m at 1.21% Li2O, (Ki)
- YLP-0152: 5 m at 1.24% Li2O, (Nite)
Discussion of Results
This week’s drill results are for ten holes drilled on the Ki, BIG West and Nite pegmatite complexes. A table of composite calculations, general comments related to this discussion, and a table of collar headers are provided towards the end of this section.
Francis MacDonald, CEO of LIFT comments, “Hole YLP-0184 at the Ki pegmatite is located 500 m to the northwest of any drilling completed to date. This hole confirms that spodumene mineralization is present in drilling over 900 m of strike length at Ki. We look forward to drilling additional meters at Ki in the winter 2024 drill program to keep stepping out along strike and down dip of mineralization intersected to date.”