LIFT Initiates Surface Exploration Program at the CALI Property NWT, Canada
22 August 2023
August 22, 2023 – Vancouver, B.C., Li-FT Power Ltd. (“LIFT” or the “Company”) (CSE: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased announce the start of exploration activities at the 100% owned CALI Lithium Project located in the Little Nahanni Pegmatite Group in western NWT, Canada.
The CALI property hosts a series of north-northwest trending spodumene pegmatite dykes located at the northern end of a 13 kilometre-long spodumene pegmatite dyke trend known as the Little Nahanni Pegmatite Group1. The CALI property is located approximately six kilometres from the Howard’s Pass access road and 50 kilometres to the northwest of the past-producing Cantung mine.
Historical geological mapping within the LIFT concessions describes the dykes as outcropping over a 500-metre strike length, having a 300-metre outcropping vertical extent, and occurring as parallel dykes in corridors up to 100-metres wide2. Float mapping, as verified by LIFT management in a recent site visit, in areas where the dykes trend under cover suggests that the lithium-bearing dykes on the property could be up to 1,100 metres in length (Figures 1, 2 & 3). The current exploration program has been designed to better understand the average grade across the dyke’s exposed strike length to 300 metres vertical with systematic rock sampling and mapping. Prospecting for other parallel dykes and dyke extensions trending onto the CALI project from the south will also be carried out through detailed soil sampling.
Francis MacDonald, CEO of LIFT comments “During our recent field visit to the CALI property in late June, we were very impressed with the amount of spodumene-bearing boulders covering the surface. The spodumene percentages that we observed were quite high and we also expect very good grades to come back from surface sampling. The extent of this spodumene pegmatite dyke swarm is impressive and we believe there is excellent potential at the CALI project to demonstrate a large spodumene resource that is also relatively close to transportation infrastructure.”
The Company plans to integrate the data collected into a 3D geology model for exploration targeting and planning for an exploration/resource definition drill program in summer 2024. The Company is in the final stages of a Land Use Permit application for advanced exploration activities which includes drilling.