Gold Terra Drilling Confirms Gold Mineralization at South Con Mine Extension Along the Campbell Shear, Newmont Option, NWT

14 June 2021

June 14, 2021, Vancouver, B.C. – Gold Terra Resource Corp. (TSX-V: YGT; Frankfurt: TX0; OTC QX: YGTFF) (“Gold Terra” or the “Company”) is pleased to announce assay results for the last two drill holes from the Phase 1 drilling program at the Company's optioned property from Newmont Ventures Limited and Miramar Northern Mining Limited (the "Newmont Option") adjacent to its Yellowknife City Gold Project ("YCG"), NWT. The Company has completed 13 holes totalling 7,242 metres and is scheduled to start the Phase 2 Drilling Program in July.

President and CEO David Suda stated, “Phase 1 drilling with a 200-metre spacing has been a success confirming the Campbell Shear gold-bearing structure. The continuity of mineralization, low-grade and high-grade, is identified by several gold-bearing zones that require follow-up drilling as they have the same signature as gold-bearing zones in the Con Mine.  Phase 2  follow-up drilling will begin this July focusing on closer-spaced drill targets on our best Phase 1 drill results and will comprise a 10,000-metre drilling program. The 2-kilometre stretch remains open at depth and along strike.”

To learn more about the Phase 1 drilling results and Phase 2 targets, please join us for an Investor Webinar hosted by Kerry Lutz and Gold Terra management David Suda and Gerald Panneton on Monday June 14, 2021, 11:00 AM - 12:00 PM EDT. Register to attend this live Investor Summit at:

https://attendee.gotowebinar.com/register/6987609014132298254?source=GT

Read the full release for details.