TMAC announces Q1 2020 operating results

12 May 2020

TMAC Resources Inc. reports first quarter 2020 results for production and certain operating metrics.

First quarter 2020 production summary

  • Production: 32,290 ounces of gold produced
  • Sales: 27,710 ounces of gold sold
  • Mining: 1,760 tonnes per day (“tpd”), with a grade of 10.2 grams per tonne (“g/t”) Au
  • Processing: 1,110 tpd, with a feed grade of 11.9 g/t Au, and 84% recovery
  • Development metres: 2,130 metres at Doris and Madrid