Osisko Metals intersects 6.43% zinc+lead Over 11.16m and 12.5% zinc+lead over 3.85m at Pine Point

22 October 2018

Osisko Metals Incorporated is pleased to announce assay results from 14 drill holes completed at the M-40 deposit at the west end of the East Mill Zone in the Pine Point Mining Camp (“PPMC”). Drill hole M40-18-PP-021 intersected 5.04% Zinc and 1.39% Lead over 11.16 metres and hole M40-18-PP-008 intersected 8.73% Zinc and 3.77% Lead over 3.85 metres. All intersections are within a flat lying tabular-style deposit known as M-40 and all intercepts are located above 45 metre depths.