Osisko Metals intersects 21.47% zinc+lead over 9.98 metres at Pine Point
9 October 2018
Osisko Metals Incorporated is pleased to announce assay results from 14 drill holes completed in the East Mill Zone in the Pine Point Mining Camp (“PPMC”). Drill hole EM-18-PP-140 intersected 13.91% Zinc and 7.56% Lead (21.47% Zinc + Lead) over 9.98 metres and hole EM-18-PP-152 intersected 4.22% Zinc and 2.56% Lead (21.47% Lead + Zinc) over 8.20 metres. All intersections are within a flat lying tabular-style deposit known as K-32 and all intercepts are located above 42 metre depths. (See 2018 Summer Drill East Mill Zone K-32).
