Osisko Metals intersects 8.23% zinc+lead over 10.50 metres at Pine Point
10 September 2018
Osisko Metals Incorporated is pleased to announce assay results from 18 drill holes completed in the East Mill Zone at the Pine Point Mining Camp. Drill hole EM-18-PP-112 intersected 6.42% Zinc and 1.81% Lead over 10.50 metres and hole EM-18-PP-123 intersected 11.13% Zinc and 3.27% Lead over 6.52 metres. A high-grade lead intersection was also intersected in Hole EM-18-PP-113 that graded 7.00% Zinc and 18.00% Lead over 6.00 metres. While mineralization at Pine Point is predominantly rich in Zinc, similar anomalous high-grade lead intersections can occur locally and represent further upside to our infill drill campaign.
