Osisko Metals intersects 19.68% zinc+lead over 6.30 metres at Pine Point

1 October 2018

Osisko Metals Incorporated is pleased to announce assay results from 9 drill holes completed in the East Mill Zone located in the Pine Point Mining Camp. Drill hole EM-18-PP-133 intersected 12.71% Zinc and 6.97% Lead (19.68% Lead + Zinc) over 6.30 metres.  Three other holes also intersected significant zones of mineralization: hole EM-18-PP-136 intersected 3.96% Zinc and 2.29% Lead (6.25% Lead + Zinc) over 5.33 metres, hole EM-18-PP-147 intersected 6.36% Zinc and 0.80% Lead (7.16% Lead + Zinc) over 7.85 metres, and hole EM-18-PP-148 intersected 7.65% Zinc and 1.33% Lead (8.98% Lead + Zinc)over 8.98 metres.
All intersections are within a flat lying tabular-style deposit known as L-36 and all intercepts are located above 40 metre vertical depths. (See 2018 Summer Drill Campaign East Mill L-36).