Kennady Completes Successful Summer Program
11 September 2017
- Faraday 2 extended by 150 metres along strike
- Faraday 1 & 3 confirmed as one kimberlite
President and CEO of Kennady Diamonds, Dr. Rory Moore commented: “We are very pleased with the results of the 2017 summer drilling program. By continuing the methodical approach to our drilling, we have successfully extended the Faraday 2 kimberlite a further 150 metres along strike. It is particularly noteworthy that the kimberlite has maintained a relatively constant depth as it tracks northwards. The total strike length of Faraday 2 now stands at approximately 600 metres, and the latest drilling will add significant tonnage to the high-grade resource potential of this kimberlite. The final hole of the program delivered a 64.6-metre kimberlite intercept, one of the longest kimberlite intercepts drilled on Faraday 2 to date.”
