Osisko Metals intersects 12.94% zinc+lead over 8.80 metres at Pine Point

3 April 2019

Osisko Metals Incorporated is pleased to announce additional assay results from 34 drill holes completed in the East Mill Zone (“EMZ”) within the Pine Point Mining Camp (“PPMC”). Drill hole EM-18-PP-226 intersected 6.30% Zinc and 6.64% Lead over 8.80 metres and drill hole EM-18-PP-221 intersected 7.37% Zinc and 4.56% Lead over 6.00 metres (see 2018 Summer Drill Campaign East Mill Zone K-35).