Peregrine Diamonds provides 2017 Chidliak drill program update

23 August 2017

Peregrine Diamonds Ltd. is pleased to announce the completion of three diamond drill holes totaling 1,474 metres drilled at its 100%-owned Chidliak Diamond Project near Iqaluit, Nunavut, Canada. Core hole CHI-050-17-DD36 is a 378 metre vertical hole that intersected kimberlite from 4.5 to 295.8 metres below surface, consistent with the resource model for the CH-6 kimberlite. Core hole CHI-050-17-DD38 was drilled at -60 degrees inclination for a total hole length of 560 metres, equivalent to 485 mbs. DD38 intersected 190.2 metres of typical olivine-rich CH-6 kimberlite from 277 to 442 mbs. The DD38 result confirms the in-section result from DD33 previously reported, delineating expanded margins for the high grade CH-6 kimberlite with depth. Core hole CHI-050-17-DD39 is a 536 metre near-vertical hole. This hole ended in kimberlite at 532 mbs and confirms the kimberlite extends beyond 500 mbs, the current planned extent of the resource expansion program drilling in 2017.