Osisko Metals intersects 19.42% zinc+lead over 13.11 metres at Pine Point

22 May 2019

Osisko Metals is pleased to announce additional assay results from 145 drill holes completed in the L-36 and L-35 areas within the East Mill Zone in the Pine Point Mining Camp. Drill hole EM-18-PP-331 intersected 10.23% zinc and 9.19% lead over 13.11 metres and hole EM-18-PP-209 intersected 9.60% zinc and 1.53% lead over 13.50 metres. Other highlighted intersections are noted in Table 1 below. All intersections are within flat-lying tabular-style deposits, and are located between 9 to 51