Sabina Gold & Silver grows the Llama Extension to over 400 meters along strike

18 September 2018

 Sabina Gold & Silver Corp is pleased to announce results from six drill holes completed at the Llama Extension zone where drilling has principally focused on expanding the up-plunge extent of the mineral zone towards the known Llama underground resource (Figure 1.0 & Figure 2.0) at the Company’s 100% owned Back River Project.
Five of the six drill holes completed during the current summer drilling campaign have successfully targeted the Llama gold structure over a strike extent of approximately 200 m up-plunge from the previous 2017 and 2018 drilling that returned a number of high grade intercepts over significant lengths (see previous news releases: Sept 5, 2017, April 2, 2018 & May 8, 2018). Selected significant values from these six drill holes are listed below in Table 1.0 and include 17.96 g/t Au over 4.60 m from drill hole 18GSE548B and 6.20 g/t Au over 13.80 m from drill hole 18GSE547. A single drill hole, 18GSE546, drilled 26 m along strike in the open down-plunge direction from current drilling, returned values of 11.43 g/t Au over 5.48 m and continues to demonstrate that the gold structure is open at depth.