Sabina Gold & Silver reports final results from spring drill program

5 June 2018

Sabina Gold & Silver Corp is pleased to announce final results from this year’s phase one, spring exploration diamond drilling program at its 100% owned Back River Gold Project in Nunavut Canada. A spring exploration drill program of 6,033 meters in 10 drill holes at six target areas on the Goose property was completed during early May. Drilling successfully tested target areas in and around existing mineral resources at the Llama and Umwelt deposits and stand-alone exploration targets outside of the known resource areas. Highlights from drilling, in addition to results previously released from the newly discovered high grade Llama Extension zone, include results from: 1) two drill holes that tested the Umwelt structure north of the high grade Vault zone; 2) additional up-hole assays returned from one of the high grade drill holes at the Llama Extension zone; and 3) results from the initial testing of the possible extension of the Goose Main structure (the Nuvuyak target) over 700m west of defined open pit mineralization.