TMAC initial drilling at Boston intersects 15.3 g/t gold over 22.3 metres

11 August 2017

TMAC Resources Inc. is pleased to report that the first drilling campaign at the Boston Deposit, located in the south of its 100% owned Hope Bay Project, has intersected significant high-grade gold mineralization over wide widths. The ongoing, initial drilling is designed to extend wide, high-grade trends within the current resource model. In addition, ongoing drilling at Doris below the dyke continues to intersect high grade gold over mineable widths and the underground development there confirms the continuity of the ore bearing structures at depth below the diabase dyke.